top of page
50m Sailing Yacht Fidelis
Full hull wrap using 3M dark blue film.
LOCATION
Italy
TIME SCALE
2 Weeks
SIZE
56m
ACCESS
Wrap around scaffolding with tenting from the caprail down
56m Sailing yacht Fidelis, built by by the Italian shipyard Perini Navi came to us for a solution for a tired looking hull with patch paint work. A very busy schedule gave no time for a re-spray so wrapping became a great option.
The hull was wrapped in 2 weeks in Italy, the wrap has given the hull a constant colour and gloss that will easily last the three years she has until a major planned refit period.
She was out of the water and partially tented.
Access was good with wrap around scaffolding.
PROJECT FEATURES
Very quick turn around.
Project Gallery
bottom of page